Cinergy Field/Reds Ballpark
Environmental Project Management

Project Owner's Name and Address
Hamilton County Public Works
138 E. Court Street
Cincinnati, Ohio 45202

Completion Date
(actual or estimated):
2004

Estimated Cost (thousands):
Entire Project: $ 500,000

Work for Which Firm
was/is responsible:
$ 353

Foppe Technical Group, Inc. served as the Environmental Project Manager for the New Construction and Demolition since May 2000. FOPPE was tasked with conducting a preliminary hazardous materials assessment of the areas of Cinergy Field designated for early demolition and renovation. The results of this assessment were to be used to develop bid specifications for hazardous material abatement work in those areas. These tasks were completed within one month of signing the preliminary agreement. The hazardous materials survey was completed in the subsequent month along with the Phase I investigation, and remediation/abatement contractors were hired through an open bidding process within 3 months of Project initiation.

To date, FOPPE has provided real-time, responsive support to Hamilton County to address all environmental issues as they are encountered and anticipated throughout the project. The initial phase of the abatement work was completed within 6 weeks of contract award. When impacted soil was encountered in the construction zone, FOPPE responded immediately to assess the nature of the impact and worked with Hunt Construction Group, Inc. to manage the impacted soils in a way that minimized schedule impacts and reduced costs through appropriate off site treatment and disposal. Currently, FOPPE is working with the demolition contractor to complete the Phase II investigation of areas of environmental concern based on the Phase I findings as well as continuing assessment activities on the release of gasoline from the former underground storage tank system at this facility. FOPPE has demonstrated availability on an as needed basis to provide environmental support and assessment in a way that minimizes impacts to schedules and costs.

Civil Engineering | Land Surveying | Environmental Consulting | Geotechnical Engineering | Construction Testing & Inspection
Why FOPPE Technical Group | Licenses and Certifications | Services | Projects | Contact Us | Home
  Cincinnati Office
11415 Century Boulevard
Cincinnati, OH 45246
Phone (513) 671-8144   Fax (513) 671-8150
Northern Kentucky Office
7900 Tanners Gate Lane Suite 120
Florence, KY 41042
Phone (859) 538-1163   Fax (859) 538-1970